asrs

asrs
> asrs > the automotive parts industry > a certain company's semi-finished product warehouse

a certain company's semi-pg电子游戏网站

the first party of this project will renovate the existing semi-finished product warehouse using the existing shelves. firstly, for the miscellaneous warehouse, the full process data-driven and intelligent management of material entry and exit will be carried out. based on its own product advantages and industry experience, jinshi has integrated its hardware and software technical capabilities to design a complete solution for the three-dimensional warehouse.

● storage capacity: 592
● stacking height: 8 layers
● in/out efficiency: 44 pallets/hour

the fastest delivery time is 2 months
traditional three-dimensional warehouses require a delivery time of 6-10 months. jinshi has independently developed a drive control integrated containerless control system, which greatly shortens the delivery time

increase storage capacity by 20%
the traditional stacker crane has 9 layers, and jinshi is driven by gears and racks. it has a servo motor without steel wire ropes and can stack up to 11 layers.

energy saving of 40%
the glink ii industrial bus technology, which adopts independent technology, achieves a data exchange rate of milliseconds.
due to the fast data exchange speed, the overall speed of the line is increased by more than 30% compared to traditional control methods, and the safety and reliability are also doubled.

2023120807313650
网站地图